Chevelle SS Restomod Phase II: the body

two col ruler

The body of the Chevelle needed some attention after forty-two years.  Similar to the frame, the body was media blasted, so a thorough examination could be conducted.  Metal and bodywork is the specialty of Alex Laventure, metal fabricator at PSI, so all of the metalwork was done in-house by Laventure.  He patched holes, replaced sections, and reformed metal to get the body back to the way it should be.  The conversion to a 5-speed also required some modifications to the body.  The firewall was cut to accommodate the new pedals.  The tranny tunnel or hump was modified to fit the 5-Speed transmission.

SNV37499

Some surface rust in the interior.

IMG_0324

A rear section that had to be replaced.IMG_0273

Some photos of areas that needed some attention.

DSCN3313

The modified tranny tunnel for the 5-speed transmission.

ba crop

This is an example of a body panel that Laventure needed to cut out and replace.

IMG_0342

The bottom of the trunk that Laventure replaced.

SNV38730

Once all metalwork was completed, the body and exterior pieces were painted.

Tags:

Leave a Reply